Our Build Process
02Step 02 of 6
Dig / Frame
Precise excavation and structural framing tailored to your yard.
Typical duration: 1 week

What Actually Happens
Dig / Frame — In Plain Words
- 1Excavators dig to engineered specifications, respecting utility lines and setbacks.
- 2Site grading levels the shell footprint and preps for structural framing.
- 3Wooden or metal formwork frames the exact shape of your pool.
- 4Depth benches, sun shelves, and step transitions all rough-in at this stage.